From string lines to lights on
01 / 05Mark the Footprint
At sunrise, survey stakes and orange string outline the house on the empty lot, clear of both live oaks.
02 / 05Pour the Slab
Plumbing pipes rise through the concrete slab where the kitchen and bathrooms will go.
03 / 05Frame the House
Wood studs outline the rooms, and roof trusses span the walls.
04 / 05Roof and Windows
The roof and windows are in place while the plywood walls are still bare.
05 / 05Lights Come On
At dusk, a new walkway crosses the fresh lawn to the finished house, its windows lit from within.



